Installation and positioning of diesel generator on prepared foundation. Supply and installation of exhaust system including heavy-duty silencer and catalytic converter. Installation of flexible connections to absorb vibration and thermal expansion. Installation of radiator discharge air duct with proper sealing to prevent air leakage.
Project Detail
Client:Al-Wajh Airport
Location:Red Sea Global - Amaala
Scope:Mechanical & Electrical Works (Generator, Exhaust System & Catalytic Converter Installation)